Slab Track S21 Lot A

Slab Track "Rheda 2000" with trafficability in the single- and multi-track tunnels "Feuerbach" (approx 3,5 km) and "Cannstatt" (approx 3 km) as well as on earthwork structures

Urheber: Thomas Niedermüller

Photo: Thomas Niedermüller

Client

DB Projekt Stuttgart-Ulm GmbH

Project volume

45.7 million

Construction time

06/2020 - 12/2024 (54 month)

  • 13,500 m Slab Track
  • 1,300 m Light mass spring system (25 Hz)
  • 11,900 m Trafficability
  • 6 pc Switches (slab track), including 2 future switches
  • 0.9 km Ballast superstructure
  • 2 pc Rail expansion joints (ballast superstructure)
  • 348 km Cable laying
  • Mechanical equipment (ventilation of technical rooms)
  • 50 Hz equipment
  • Telecommunications systems