Slab Track S21 Lot A
Slab Track "Rheda 2000" with trafficability in the single- and multi-track tunnels "Feuerbach" (approx 3,5 km) and "Cannstatt" (approx 3 km) as well as on earthwork structures
Photo: Thomas Niedermüller
Client
DB Projekt Stuttgart-Ulm GmbH
Project volume
45.7 million
Construction time
06/2020 - 12/2024 (54 month)
- 13,500 m Slab Track
- 1,300 m Light mass spring system (25 Hz)
- 11,900 m Trafficability
- 6 pc Switches (slab track), including 2 future switches
- 0.9 km Ballast superstructure
- 2 pc Rail expansion joints (ballast superstructure)
- 348 km Cable laying
- Mechanical equipment (ventilation of technical rooms)
- 50 Hz equipment
- Telecommunications systems
You can view the DB report on our publication page:
https://nordwest.eiffage-infra.de/de/service/publikationen