Rheinboulevard Cologne-Deutz
Road work at Rheinboulevard Cologne-Deutz.
Client
City of Cologne
Project volume
EUR 2.4 million
Construction time
04/2015 – 04/2016 (13 months)
Services
Redesign of the right bank of the Rhine in the Deutz district between the Hohenzollern and Deutzer bridges. The basic element of the bank design is the construction of wide river bank steps with accompanying pathways.