Rheinboulevard Cologne-Deutz

Road work at Rheinboulevard Cologne-Deutz.

Rheinboulevard Köln(1)

Client

City of Cologne

Project volume

EUR 2.4 million

Construction time

04/2015 – 04/2016 (13 months)

Redesign of the right bank of the Rhine in the Deutz district between the Hohenzollern and Deutzer bridges. The basic element of the bank design is the construction of wide river bank steps with accompanying pathways.