Oldenburg–Wilhelmshaven PFA 4 line upgrade

Oldenburg–Wilhelmshaven, AS IIIb, PFA 4 line upgrade, Lot 1, overall construction

Oldenburg-Wilhelmshaven(1)

Client

DB Netz AG, Großprojekte Regionalbereich Nord, Hannover

Project volume

EUR 63.25 million

Construction time

09/2016 – 11/2019 (39 months)

On the Oldenburg–Wilhelmshaven dual-track line 1522 between Varel and Sande from km 35.200 to km 43.950; permissible travel speeds will be increased to 120 km/h and axle loads to 23.5 tonnes. The section of line, including tracks and structures, is to therefore undergo complete renewal during single-track operation and weekend closures.

 

  • approx. 17,200 m of track renewal
  • approx. 17,200 m of drainage work
  • Installation of a geotextile-coated protective layer for 2 tracks along 2,230 m
  • Soil improvement using the milling-mixing injection method to a depth of 9 m over a distance of 6,200 m
  • Construction of 180 m of roadway foundations on 105 bored piles up to 28 m in length
  • Soil improvement via partially cemented vibrating stone columns over a distance of 220 m
  • Renewal of a steel bridge built on drilling piles 
  • Installation of support plates over existing culverts in FMI sections
  • Underground cable construction along 8,600 m of track length
  • New noise barrier 870 m in length
  • Technical equipment