Boye waste water sewerage duct, lots 1 and 2

Construction of a 2.65-km-long waste water sewerage duct parallel to the Bottrop Boye in the Gladbeck/Bottrop area.

Bottrop-Boye(1)

Client

Emschergenossenschaft, Essen

Project volume

EUR 29.8 million

Construction time

06/2013 – 12/2016 (43 months)

The regional Boye receiving water has been ecologically enhanced thanks to the new waste water sewerage duct. The waste water feed, which previously ran into the Emscher tributary, will be underground in future. The joint venture is undertaking the jacking, the frame sections and the manhole structures made from reinforced concrete. Wittfeld (now Eiffage Infra-Nordwest) is laying open design pipelines. A sewer with storage capacity and overflow (with lower-lying discharge) as a discharge facility and restoration work complete the range. 

•    30,000 t of earth movement
•    19,000 m² of sheet pile construction
•    3,800 m² of bored pile wall
•    760 m of open laying of reinforced concrete pipes DN 800 – 3500
•    1,900 m of jacking with compressed air DN 1800 - DN 3500
•    7,000 m³ of reinforced concrete construction