ABS Oldenburg-Wilhelmshaven, AS IIIB, PFA 4, Lot 2 and removal of level crossing at Deichstraße

On the line 1522 Oldenburg to Wilhelmshaven in the section km 43.950 to km 45.800 the station Sande is completely rebuilt and renewed with main and sidetracks under single-track operation.

OL-WHV 4.2_1

Client

DB Netz AG, Hannover

Project volume

EUR 32.6 million

Construction time

01/2019 - 12/2021 (36 month)

In addition to the track and civil engineering work, a new pedestrian underpass will be built and subsoil reinfocement under the main tracks will be carried out using the milling mix injection method.

Services

  • Track construction
  • Civil engineering
  • Dewatering systems
  • Cable civil engineering
  • Cable laying
  • Subsoil reinforcement / Special civil engineering
  • Noise protection wall
  • Pedestrian underpass Deichstraße
  • Platform work
  • Demolition of a pedestrian overpass building